

#I39 reliever route detailed mat free
Further evaluation between Wisconsin Dells and Tomah may be part of a possible future corridor study. Free delivery and returns on eligible orders. The purpose of the study was to provide information to make informed decisions for the I-39/90-/94 corridor regarding potential future safety, pavement, bridge, or other improvement projects. Future year analysis included forecasts for conditions through the year 2050. Evaluations included analysis of traffic, safety, pavement, and structures within the corridor. The study evaluated the existing and future conditions along I-90 corridor from US 12/18 in Madison to the I-90 I-94 split in Tomah (approximately 100 miles), including a portion of I-39 from County V to WIS 16.

I-39/90/94 Corridor Study – Public involvement page. Status/phase Detailed street map and route planner provided by Google. Finalize environmental impact analysisįor more information about public involvement opportunities and other activities, visit the.*Please note, off alignment options are not being considered for this study Schedule The EIS process, which will include ongoing opportunities for public involvement, will lead to the identification of a preferred alternative. WisDOT will identify project needs and evaluate a range of alternatives in an environmental impact statement (EIS).The study will assess how best to address existing and future traffic demands, safety issues and the aging and outdated infrastructure along this portion of I-39/90/94.The study will also evaluate I-39 from the I-39 and I-90/94 split near Portage (locally known as the Petro Interchange) to Levee Road. The Federal Highway Administration (FHWA) and WisDOT are evaluating potential improvements to the I-39/90/94 corridor in Dane, Columbia, Sauk and Juneau counties from US 12/18 (Beltline) in Madison to just north of the US 12/WIS 16 interchange in Wisconsin Dells.May 2020 - Public Involvement Meeting (PIM) #2Ĭascade Mountain Road, Cascade Mountain Road bridge over I-39, and the four interchange ramps will be detoured for construction.May 2020 - Public Involvement Meeting (PIM) #1.Installation of barrier wall at the I-39/WIS 33 interchange NorthWest off Ramp.Repairs to median barrier wall on I-39 southbound between Cascade Mountain Road and I-90/94/78 interchange.Repairs to Bridge on Cascade Mountain Road over I-39.
#I39 reliever route detailed mat crack
Joint and Crack Repair on Cascade Mountain Road and its interchange ramps.Preliminary Plans include resurfacing of Cascade Mountain Road and the four interchange ramps, repairs on the Cascade Mountain Road Bridge over I-39, repairs to the existing median barrier wall on southbound I-39 between Cascade Mountain Road and WIS 78, and flood abatement at the I-39/WIS 33 interchange NorthWest off ramp. This is a multiple location project along I-39 from the WIS 78 interchange to the WIS 33 interchange.
